Qualifications Briefing Package: Resume

The key contact for The Breland Group is V. Edward Breland.

A detailed resume for Mr. Breland is provided below.


V. EDWARD BRELAND, PE, CES, CEI, REA
President/Principal

Education
B.S., Civil Engineering
Tulane University, 1978

Post Graduate Engineering Studies in Solid Waste Management
Tulane University

H.U.D. Multi-Family Accelerated Program (MAP) Training
Baltimore, Maryland

Professional Liability Certification
DPIC Companies

Registration
Registered Professional Engineer - Texas
Certified Environmental Specialist - National
Certified Environmental Inspector - National
Registered Environmental Assessor - California

Employment
The Breland Group, LLC
1998 - Present: President

Barge, Waggoner, Sumner & Cannon, Inc.
1994 - 1998: Vice President
1990 - 1994: Environmental Manager

Lichliter/Jameson & Associates, Inc.
1990: Vice President and Director of Environmental Division, Houston
1986 - 1990: Principal/Vice President and Regional Manager, Nashville
1984 - 1986: Principal/Vice President and Regional Manager, Austin
1980 - 1984: Project Manager, Houston

Bernard Johnson, Inc.
1978 - 1980: Project Engineer

Associations
NSPE, ASCE, TSPE, EAA

RELEVANT EXPERIENCE:
Building Condition and Environmental Assessment
Responsible for the site reconnaissance, regulatory research, and report preparation of over 2,400 environmental site assessment and building condition reports annually for nation-wide clientele including lending institutions, legal firms, real estate companies, general commercial companies, heavy industries, life insurance companies, and several of the nations largest health care corporations. Sampling and analysis of suspect asbestos containing material, radon, potable water, EMFs, lead-based paint, and soil and groundwater was performed when deemed necessary. Projects span over 35 states.

Environmental Engineering
Tennessee Titans Football Stadium
Environmental and Demolition Activities

Principal-in-Charge for all daily activities including site reconnaissance, project management, surface and sub-surface sampling and analysis, environmental report preparation, and regulatory coordination for the acquisition of all parcels comprising the TENNFL site. Responsible for all demolition coordination activities of the 70+ structures removed for the stadium construction including suspect asbestos containing material sampling and analysis. Work performed for the MDHA.

Nashville COE, Open-End Contract
Principal-in-Charge and responsible for suspect asbestos containing material sampling and analysis and preparation of Quick Turnaround Design (QTD) reports for over 500 buildings located within the Ft. Campbell base, Ft. Campbell, KY. Sub to SAIC.

Nashville COE, Open-End Contract
Principal-in-Charge and responsible for suspect asbestos containing material sampling and analysis and preparation of Quick Turnaround Design (QTD) reports for over 200 buildings located within the Ft. Campbell base, Ft. Campbell, KY. Sub to Ensafe.

Nashville COE, Open-End Contract
Provided engineering services for open-end design contract. Notable projects involved design for demolition and debris removal for abandoned water and wastewater treatment plants at the former Stewart AFB, Smyrna, TN.

Nashville COE Construction Site Clearance (Stewart AFB)
Under open-end project, provided site assessment services including regulatory review, on-site investigation for hazardous and toxic materials, and electro-magnetic surveys.

Whittemore Branch Flood Study (Nashville, TN)
Responsible for detailed survey of channel cross-sections, preparation of stormwater basin plan, flood analysis and FEMA data summary. Work performed for Metro Public Works.

Whittemore Branch Sewer Overflow Abatement
Prepare a study to determine the need for rehabilitation or expansion of the existing sewer system. Project scope included determining where to place flow monitoring devices, compiling data on the projected flow of the basin, determining the capacity of the existing sewer lines and preparing cost estimates. Work performed for Metro Water and Sewer Services.

Paragon Mills Sewer Overflow Abatement
Prepare a study to determine the need for rehabilitation or expansion of the existing sewer system. Project scope included determining where to place flow monitoring devices, compiling data on the projected flow of the basin, determining the capacity of the existing sewer lines and preparing cost estimates. Work performed for Metro Water and Sewer Services.

Franklin County Transfer Station (Winchester, TN)
Project manager for the planing and design of a 65-ton per day solid waste transfer station and material recovery facility, including compacting operation, source separation for construction debris, and tire storage area.

Other Engineering Experience
Tony Sudekum/Preston Taylor Homes Drainage Study
(Nashville, TN) Principal-in-Charge and responsible for assessnt and drainage improvements for two housing communities. Work performed for the MDHA.

Looby Heights Subdivision (Nashville, TN)
Principal-in-Charge and responsible for the site feasibility study, planning, infrastructure design and construction administration for this 8 acre new concept in affordable single-family housing. Work performed for a joint venture between the MDHA and Brookside Properties.

Material Recovery Facility/Transfer Station Study (Nashville, TN)
Prepared a feasibility and site-use study for the potential use of an existing 120,000 SF warehouse facility as a city-wide solid waste transfer station as well as a material recovery facility (MRF) to sort post-consumer recyclable products. Work performed for a joint venture between Steiner-Liff Iron and Metal and Metro Public Works.

Steiner-Liff Recycling/Material Recovery Facility (Nashville, TN)
Responsible for a feasibility analysis, planning and design of a low-cost, low-labor intensive recycling/material recovery facility.